by way of lifting and shifting the swimming pool into the northern setback to lower dewatering, earthworks, uncovered aggregate concrete economies, decreased retaining partitions, a rationalising roof redesign by lowering box gutters, centralising plumbing solutions, re-configuring the air con design, substitutions in cabinetwork picks by means of